The Kyiv City State Administration (KCSA) announced that the capital is fully ready for the heating season. All heating plants (CHPs) are prepared for operation, and certain elements of the equipment have been additionally protected to ensure uninterrupted heat supply.
Decision-Making Process for Heating Supply
The decision to turn on heating in Kyiv will be made considering several factors:
- Air temperature;
- Weather forecasts;
- The need to save gas.
These factors will help determine the optimal time to start supplying heat to residential buildings and other facilities.
Priority for Heating Connection
According to the KCSA, the first to be connected to heating will be:
- Hospitals;
- Social institutions.
Only after this will a decision be made regarding the heating of residential buildings, ensuring comfort and safety, especially for vulnerable groups of the population.