Today, October 24, 2026, train services between the "Vydubychi" and "Slavutych" metro stations have been resumed. This became possible thanks to the successful completion of all necessary work by metro specialists aimed at eliminating the consequences of a recent enemy shelling.
Resumption of Train Services
Metro specialists took all necessary measures to ensure passenger safety and restore services. The green line of the metro is now operating as usual, allowing passengers to use public transport without hindrance.
Threat Levels and Their Impact on Services
It is important to note that during the yellow threat level, metro trains operate on the above-ground section of the green line. In the case of a red threat level, train services on the Southern Bridge are suspended, which is a crucial measure for ensuring passenger safety.